Skip to main content

GB Asset Explorer

Track operating stations, compare performance and explore the renewable and storage pipeline.

Mapped stations
189
Declared output
Stations with outages
Watchlist
0

My fleet

Add stations with the star buttons below to build a browser-private monitoring workspace.

Operating stations

Aberdeen Bay — 99 MW capacityAChruach Wind Farm — 42.6 MW capacityAfton — 50 MW capacityAikengall 2 Wind Farm Generation — 227.2 MW capacityAn Suidhe Windfarm — 19.4 MW capacityArecleoch Windfarm — 114 MW capacityBad a Cheo — 270 MW capacityBaglan Bay — 532 MW capacityBarrow Offshore Windfarm — 90 MW capacityBeatrice — 681.5 MW capacityBeauly Cascade — 93.5 MW capacityBeinneun Wind Farm — 108.8 MW capacityBenbrack — 67 MW capacity (regional position)Bhlaraidh Windfarm 1 — 108 MW capacityBlack Law Wind Farm — 187 MW capacityBlackcraig Windfarm — 56.2 MW capacityBlackhillock — 208.8 MW capacity (regional position)Bredbury — 49.9 MW capacity (regional position)Brockloch Rig 2 Windfarm — 61.5 MW capacityBroken Cross — 48 MW capacity (regional position)Burbo Bank Offshore Windfarm — 257.7 MW capacityBurwell Solar — 50 MW capacity (regional position)Bustleholme — 52.2 MW capacity (regional position)Capenhurst — 105.1 MW capacity (regional position)Carraig Gheal Wind Farm — 46 MW capacityCarrington — 940 MW capacityCleve Hill Solar — 317 MW capacity (regional position)Clunie Cascade — 76.2 MW capacityClyde Central Windfarm, Clyde North Windfarm, Clyde South Windfarm — 550 MW capacityConnahs Quay — 1,407.2 MW capacityConon Cascade — 95.2 MW capacityCorriegarth Wind Farm — 69 MW capacityCorriemoillie Wind Farm — 48 MW capacityCoryton — 856.2 MW capacityCottam Development Centre Limited — 445 MW capacityCour Wind Farm — 20.5 MW capacityCoventry — 50.4 MW capacity (regional position)Cowley — 50.4 MW capacity (regional position)Coylton — 50 MW capacity (regional position)Creag Riabhach — 93 MW capacity (regional position)Crossdykes — 48 MW capacityCruachan — 453.3 MW capacityCrystal Rig Wind Farm — 212.6 MW capacityCumberhead — 52 MW capacity (regional position)Cumberhead West — 126 MW capacity (regional position)Dalquhandy — 42.8 MW capacity (regional position)Damhead Creek — 820 MW capacityDersalloch Windfarm — 70.9 MW capacityDidcot — 1,490 MW capacityDinorwig — 1,920 MW capacityDogger Bank A — 1,200 MW capacity (regional position)Dogger Bank B — 1,200 MW capacity (regional position)Dorenell — 313.8 MW capacityDouglas West — 45 MW capacity (regional position)Douglas West Extension — 65.5 MW capacity (regional position)Drax — 4,028.7 MW capacityDudgeon Offshore Wind Farm Generator — 402 MW capacityDun Law Extension Windfarm — 29.8 MW capacityDunmglass Wind Farm — 100 MW capacityEast Anglia — 725 MW capacityEdinbane Windfarm — 41.4 MW capacityEnderby — 57 MW capacity (regional position)Enfield Energy — 444 MW capacityEnoch Hill — 70 MW capacity (regional position)Errochty G — 76.3 MW capacityEwe Hill II Wind Farm — 38 MW capacityFallago Rig Wind Farm — 144 MW capacityFarr Wind Farm — 184 MW capacityFasnakyle G — 46.3 MW capacityFerrybridge BESS — 152 MW capacity (regional position)Ffestiniog — 364.7 MW capacityFinlarig — 85.8 MW capacityFoyers G — 320 MW capacityFreasdail Wind Farm — 22.2 MW capacityGalawhistle Wind Farm — 55.2 MW capacityGalloper Offshore Windfarm 1 — 649.8 MW capacityGarry Cascade — 40 MW capacityGlen App Wind Farm — 22 MW capacityGlen Kyllachy — 52 MW capacity (regional position)Glendoe — 100 MW capacityGordonbush Wind Farm — 145.5 MW capacityGrain — 1,462.8 MW capacityGreater Gabbard Offshore Windfarm — 720 MW capacityGriffin Wind Farm — 206 MW capacityGunfleet Sands Windfarm — 172.5 MW capacityGwynt y Mor Offshore Wind Farm — 592 MW capacityHadyard Hill Wind Farm — 130 MW capacityHagshaw Hill — 30.3 MW capacity (regional position)Halsary — 30 MW capacity (regional position)Harestanes Windfarm — 142.3 MW capacityHartlepool — 1,240 MW capacityHeysham — 2,531.2 MW capacityHigh Marnham — 13 MW capacity (regional position)Hirwaun — 299 MW capacity (regional position)Hornsea — 1,200 MW capacityHornsea 2 — 1,320 MW capacity (regional position)Humber Offshore Wind Farm — 219 MW capacityHunterston Generator — 1,020 MW capacityImmingham CHP — 1,283 MW capacityIndian Queens — 140.1 MW capacityIron Acton — 121 MW capacity (regional position)Keadby — 794 MW capacityKeadby 2 — 890 MW capacity (regional position)Keith Hill Windfarm — 4.5 MW capacityKemsley — 40.1 MW capacity (regional position)Kennoxhead — 60 MW capacity (regional position)Kilbraur Windfarm — 68.5 MW capacityKilgallioch Wind Farm — 252.7 MW capacityKillin Cascade — 70 MW capacityKillingholme — 627 MW capacityKype Muir — 89 MW capacityKype Muir Extension — 67 MW capacity (regional position)Langage — 905 MW capacityLarks Green Battery — 52 MW capacity (regional position)Larks Green Solar — 49.9 MW capacity (regional position)Limekiln — 106 MW capacity (regional position)Lincs Offshore Wind Farm — 300 MW capacityLittle Barford — 775 MW capacityLochluichart Windfarm — 69 MW capacityLondon Array Windfarm — 704.1 MW capacityMarchwood — 920 MW capacityMark Hill Windfarm — 53.8 MW capacityMedway — 750 MW capacityMGT Teesside — 285 MW capacity (regional position)Middle Muir — 51 MW capacityMillennium Wind Farm — 65 MW capacityMinnygap Wind Farm — 25 MW capacityMonk Fryston — 57 MW capacity (regional position)Moray East — 900 MW capacityMoray West — 860 MW capacity (regional position)Moriston Cascade — 74 MW capacityNant — 20 MW capacityNeart na Gaoithe — 448 MW capacity (regional position)Neilston — 50 MW capacity (regional position)North Kyle — 212 MW capacity (regional position)Ormonde Windfarm — 150.8 MW capacityPembroke Power Station — 2,375 MW capacityPen y Cymoedd Wind Farm — 228 MW capacityPencloe — 81 MW capacity (regional position)Peterhead — 1,200 MW capacityPogbie — 10 MW capacityRace Bank Offshore Wind Farm — 574 MW capacityRampion Offshore Windfarm — 400.2 MW capacityRichborough Energy Park — 99.8 MW capacity (regional position)Robin Rigg — 205.1 MW capacityRocksavage — 810 MW capacityRye House — 721 MW capacitySaltend South — 1,226.6 MW capacitySandy Knowe — 87 MW capacity (regional position)Sanquhar Community Wind Farm Generation — 32.1 MW capacitySeabank — 1,236 MW capacitySeagreen — 1,991 MW capacity (regional position)Severn Power — 850 MW capacitySheringham Shoals Windfarm — 316.8 MW capacitySizewell — 1,286.9 MW capacitySloy G — 172.5 MW capacitySouth Humber Bank — 1,401.4 MW capacitySouth Kyle — 426.9 MW capacity (regional position)Spalding — 950 MW capacitySpalding Energy Expansion — 300 MW capacity (regional position)Staythorpe — 1,857.6 MW capacityStrathy North Wind Farm 1 — 70 MW capacityStronelairg Windfarm — 324 MW capacitySundon — 50.2 MW capacity (regional position)Sutton Bridge — 850 MW capacitySutton Bridge Solar — 49.4 MW capacity (regional position)Tebworth Solar — 45.9 MW capacity (regional position)Thanet Offshore Windfarm — 517.9 MW capacityThurrock Flexible Generation Plant — 350 MW capacity (regional position)Toddleburn Wind Farm — 31.6 MW capacityTorness Generator — 1,352 MW capacityTralorg — 18.7 MW capacityTriton Knoll — 824 MW capacityTwenty Shillings — 37.8 MW capacityTye Lane Battery — 58 MW capacity (regional position)Tye Lane Solar — 49.9 MW capacity (regional position)Uskmouth — 14 MW capacityUskmouth Battery — 230 MW capacity (regional position)Viking — 487.2 MW capacity (regional position)Walney Offshore Windfarm — 1,355.6 MW capacityWest Burton — 3,432.6 MW capacityWest Burton Battery — 62 MW capacity (regional position)West of Duddon Sands — 398 MW capacityWestermost Rough Windfarm — 205 MW capacityWhitelee Wind Farm — 515 MW capacityWhiteside Hill — 27.5 MW capacityWilton — 182 MW capacity (regional position)Windy Rig — 42.8 MW capacityWishaw — 51 MW capacity (regional position)
189 assets

Circle size reflects registered capacity. Live output is the operator’s Physical Notification, not metered generation. Regional positions are used where no published site coordinate is available; distant offshore sites are pinned to the visible map edge. Connection paths are schematic. Watchlists remain in this browser only.

Compare stations

Compare two to four stations on the same capacity-utilisation scale. Selection and range are shareable in the URL.
Unavailable because this deployment has no stored history for that range.

Choose at least two stations, or use the Compare controls in the asset list.

Future-grid scenario explorer

The REPD and TEC scenario workspace loads as this section approaches the viewport.