Bustleholme

West Midlands · Battery · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
50 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
BUSTB-1Battery52 MWOperating — dated evidence

Sourced events

  1. 21 Oct 2023 · BUSTB-1

    EDF confirms the official opening and go-live of its 50 MW Bustleholme battery at the transmission substation. BUSTB-1 is the sole mapped unit. This uses the dated confirmation rather than inferring a commissioning day from the operator’s September wording. The 52.2 MW registry reference remains separate.

    Source date: 2023-10-20 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

BUSTB-1 · 50 MW · evidenced from 2023-10-21

EDF confirms the official opening and go-live of its 50 MW Bustleholme battery at the transmission substation. BUSTB-1 is the sole mapped unit. This uses the dated confirmation rather than inferring a commissioning day from the operator’s September wording. The 52.2 MW registry reference remains separate.

Source 2023-10-20 · reviewed 2026-09-13

Operator capacity source

Whole-site registered total: 52.2 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Bustleholme is a operating battery site in West Midlands. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 50 MW on the displayed capacity basis.

The source catalogue has no site coordinate, so the explorer shows a regional position rather than an exact location.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.