Bhlaraidh Windfarm 1

North Scotland · Wind · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
108 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
BHLAW-1Wind108 MWOperating — dated evidence

Sourced events

  1. 8 Jun 2020 · BHLAW-1

    Operating by the dated operator publication; this is an evidence boundary, not a commissioning timestamp or a live availability observation. The report identifies the original Bhlaraidh farm, mapped to BHLAW-1. The proposed Bhlaraidh Extension is excluded. Evidence begins at the report launch date, not an inferred 2017 commissioning day.

    Source date: 2020-06-08 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

BHLAW-1 · 108 MW · evidenced from 2020-06-08

The report identifies the original Bhlaraidh farm, mapped to BHLAW-1. The proposed Bhlaraidh Extension is excluded. Evidence begins at the report launch date, not an inferred 2017 commissioning day.

Source 2020-06-08 · reviewed 2026-09-13

Operator capacity source

Whole-site registered total: 108 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Bhlaraidh Windfarm 1 is a operating wind site in North Scotland. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 108 MW on the displayed capacity basis.

Published site coordinate.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.