Beauly Cascade
North Scotland · Hydro · Status unverified
Physical capacity is not verified for all units. Utilisation and capacity-based outage ratios are unavailable; registry values are retained as reference.
Output history
Reported availability
Unit lifecycle and sources
| BM unit | Technology | Registered capacity | Current lifecycle |
|---|---|---|---|
| CAS-BEU01 | Hydro | 94 MW | Unverified |
No sourced lifecycle event applies to these units. Registry membership does not establish operating status; zero declarations do not establish retirement.
Physical capacity evidence
Physical capacity evidence is incomplete. Registered totals are not verified installed capacity.
Whole-site registered total: 93.5 MW, including retired units.
Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.
About this asset
Beauly Cascade is a unverified hydro site in North Scotland. It has 1 non-retired (1 unverified) and 0 retired mapped Balancing Mechanism unit, with 94 MW on the displayed capacity basis.
Published site coordinate.
Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.