Sandy Knowe

South Scotland · Wind · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
86 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
SAKNW-1Wind87 MWOperating — dated evidence

Sourced events

  1. 17 Dec 2022 · SAKNW-1

    ERG's dated completion release states that the initial 50 MW was commissioned in October 2022 and the additional 36 MW phase brought Sandy Knowe to 86.4 MW installed. SAKNW-1 is the sole mapped generation BMU. Evidence begins on the next complete UTC day. The REPD 81.6 MW and 87 MW registry figures remain separate; proposed later development is excluded.

    Source date: 2022-12-16 · Reviewed: 2026-09-19

    Primary source (opens in a new tab)

Physical capacity evidence

SAKNW-1 · 86.4 MW · evidenced from 2022-12-17

ERG's dated completion release states that the initial 50 MW was commissioned in October 2022 and the additional 36 MW phase brought Sandy Knowe to 86.4 MW installed. SAKNW-1 is the sole mapped generation BMU. Evidence begins on the next complete UTC day. The REPD 81.6 MW and 87 MW registry figures remain separate; proposed later development is excluded.

Source 2022-12-16 · reviewed 2026-09-19

Operator capacity source

Whole-site registered total: 87 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Sandy Knowe is a operating wind site in South Scotland. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 86 MW on the displayed capacity basis.

The source catalogue has no site coordinate, so the explorer shows a regional position rather than an exact location.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.