Keadby 2

Yorkshire · Gas · Operating

Lifecycle
Operating
Declared output
—
Registered capacity (unverified physical)
890 MW
Declared utilisation
—

Physical capacity is not verified for all units. Utilisation and capacity-based outage ratios are unavailable; registry values are retained as reference.

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
KEAD-2Gas890 MWOperating — dated evidence

Sourced events

  1. 16 Mar 2023 · KEAD-2

    SSE FY2023 results, pages 14 and 69, date commercial operation to 15 March 2023. Applied from the next complete UTC day; preceding test generation is not a commercial-operation event. Only KEAD-2 is covered. Physical capacity remains unresolved between installed, transmission-entry and tested-output figures.

    Source date: 2023-05-24 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

Physical capacity evidence is incomplete. Registered totals are not verified installed capacity.

Whole-site registered total: 890 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Keadby 2 is a operating gas site in Yorkshire. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 890 MW on the displayed capacity basis.

The source catalogue has no site coordinate, so the explorer shows a regional position rather than an exact location.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.