Douglas West
South Scotland · Wind · Operating
Output history
Reported availability
Unit lifecycle and sources
| BM unit | Technology | Registered capacity | Current lifecycle |
|---|---|---|---|
| DOUGW-1 | Wind | 45 MW | Operating — dated evidence |
Sourced events
- 1 Jun 2026 · DOUGW-1
DESNZ DUKES 5.11, '5.11 Full list', row 503, lists Douglas West as operational at end May 2026 with 44.85 MW installed. Named generating plant; sole mapped generation BMU; identity from committed explicit override. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 45 MW registry reference remains separate.
Source date: 2026-07-30 · Reviewed: 2026-09-13
Primary source (opens in a new tab)
Physical capacity evidence
DOUGW-1 · 44.85 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 503, lists Douglas West as operational at end May 2026 with 44.85 MW installed. Named generating plant; sole mapped generation BMU; identity from committed explicit override. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 45 MW registry reference remains separate.
Source 2026-07-30 · reviewed 2026-09-13
Operator capacity sourceWhole-site registered total: 45 MW, including retired units.
Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.
About this asset
Douglas West is a operating wind site in South Scotland. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 45 MW on the displayed capacity basis.
The source catalogue has no site coordinate, so the explorer shows a regional position rather than an exact location.
Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.