Stronelairg Windfarm

North Scotland · Wind · Operating

Lifecycle
Operating
Declared output
—
Registered capacity (unverified physical)
324 MW
Declared utilisation
—

Physical capacity is not verified for all units. Utilisation and capacity-based outage ratios are unavailable; registry values are retained as reference.

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
STLGW-1Wind108 MWOperating — dated evidence
STLGW-2Wind108 MWOperating — dated evidence
STLGW-3Wind108 MWOperating — dated evidence

Sourced events

  1. 8 Jun 2020 · STLGW-1, STLGW-2, STLGW-3

    SSE identifies the completed Stronelairg wind farm in its Great Glen operating portfolio. The dictionary maps this site to STLGW-1, STLGW-2 and STLGW-3. The reported 228 MW whole-site capacity has no verified split across these units, so physical denominators remain unavailable. This is operating-site evidence by publication, not unit commissioning dates.

    Source date: 2020-06-08 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

Physical capacity evidence is incomplete. Registered totals are not verified installed capacity.

Whole-site registered total: 324 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Stronelairg Windfarm is a operating wind site in North Scotland. It has 3 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism units, with 324 MW on the displayed capacity basis.

Published site coordinate.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.