Skip to main content

Sheringham Shoals Windfarm

Off the coast of East England · Wind · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
316 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
SHRSO-1Wind158 MWOperating — dated evidence
SHRSO-2Wind158 MWOperating — dated evidence

Sourced events

  1. 1 Jun 2026 · SHRSO-1

    DESNZ DUKES 5.11, '5.11 Full list', row 1039, explicitly lists Sheringham Shoal BMU 1 as operational at end May 2026 with 158 MW installed. This exact BMU label avoids dividing the site total. The operator reports 317 MW across 88 x 3.6 MW turbines; the 158 MW government figures are reported at whole-MW BMU precision. The 158.4 MW registry reference remains separate.

    Source date: 2026-07-30 · Reviewed: 2026-09-19

    Primary source (opens in a new tab)
  2. 1 Jun 2026 · SHRSO-2

    DESNZ DUKES 5.11, '5.11 Full list', row 1040, explicitly lists Sheringham Shoal BMU 2 as operational at end May 2026 with 158 MW installed. This exact BMU label avoids dividing the site total. The operator reports 317 MW across 88 x 3.6 MW turbines; the 158 MW government figures are reported at whole-MW BMU precision. The 158.4 MW registry reference remains separate.

    Source date: 2026-07-30 · Reviewed: 2026-09-19

    Primary source (opens in a new tab)

Physical capacity evidence

SHRSO-1 · 158 MW · evidenced from 2026-06-01

DESNZ DUKES 5.11, '5.11 Full list', row 1039, explicitly lists Sheringham Shoal BMU 1 as operational at end May 2026 with 158 MW installed. This exact BMU label avoids dividing the site total. The operator reports 317 MW across 88 x 3.6 MW turbines; the 158 MW government figures are reported at whole-MW BMU precision. The 158.4 MW registry reference remains separate.

Source 2026-07-30 · reviewed 2026-09-19

Operator capacity source

SHRSO-2 · 158 MW · evidenced from 2026-06-01

DESNZ DUKES 5.11, '5.11 Full list', row 1040, explicitly lists Sheringham Shoal BMU 2 as operational at end May 2026 with 158 MW installed. This exact BMU label avoids dividing the site total. The operator reports 317 MW across 88 x 3.6 MW turbines; the 158 MW government figures are reported at whole-MW BMU precision. The 158.4 MW registry reference remains separate.

Source 2026-07-30 · reviewed 2026-09-19

Operator capacity source

Whole-site registered total: 316.8 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Sheringham Shoals Windfarm is a operating wind site in East England. It has 2 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism units, with 316 MW on the displayed capacity basis.

Published site coordinate (offshore).

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.