Sheringham Shoals Windfarm
Off the coast of East England · Wind · Operating
Output history
Reported availability
Unit lifecycle and sources
| BM unit | Technology | Registered capacity | Current lifecycle |
|---|---|---|---|
| SHRSO-1 | Wind | 158 MW | Operating — dated evidence |
| SHRSO-2 | Wind | 158 MW | Operating — dated evidence |
Sourced events
- 1 Jun 2026 · SHRSO-1
DESNZ DUKES 5.11, '5.11 Full list', row 1039, explicitly lists Sheringham Shoal BMU 1 as operational at end May 2026 with 158 MW installed. This exact BMU label avoids dividing the site total. The operator reports 317 MW across 88 x 3.6 MW turbines; the 158 MW government figures are reported at whole-MW BMU precision. The 158.4 MW registry reference remains separate.
Source date: 2026-07-30 · Reviewed: 2026-09-19
Primary source (opens in a new tab) - 1 Jun 2026 · SHRSO-2
DESNZ DUKES 5.11, '5.11 Full list', row 1040, explicitly lists Sheringham Shoal BMU 2 as operational at end May 2026 with 158 MW installed. This exact BMU label avoids dividing the site total. The operator reports 317 MW across 88 x 3.6 MW turbines; the 158 MW government figures are reported at whole-MW BMU precision. The 158.4 MW registry reference remains separate.
Source date: 2026-07-30 · Reviewed: 2026-09-19
Primary source (opens in a new tab)
Physical capacity evidence
SHRSO-1 · 158 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 1039, explicitly lists Sheringham Shoal BMU 1 as operational at end May 2026 with 158 MW installed. This exact BMU label avoids dividing the site total. The operator reports 317 MW across 88 x 3.6 MW turbines; the 158 MW government figures are reported at whole-MW BMU precision. The 158.4 MW registry reference remains separate.
Source 2026-07-30 · reviewed 2026-09-19
Operator capacity sourceSHRSO-2 · 158 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 1040, explicitly lists Sheringham Shoal BMU 2 as operational at end May 2026 with 158 MW installed. This exact BMU label avoids dividing the site total. The operator reports 317 MW across 88 x 3.6 MW turbines; the 158 MW government figures are reported at whole-MW BMU precision. The 158.4 MW registry reference remains separate.
Source 2026-07-30 · reviewed 2026-09-19
Operator capacity sourceWhole-site registered total: 316.8 MW, including retired units.
Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.
About this asset
Sheringham Shoals Windfarm is a operating wind site in East England. It has 2 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism units, with 316 MW on the displayed capacity basis.
Published site coordinate (offshore).
Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.