Pen y Cymoedd Wind Farm

South Wales · Wind · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
228 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
PNYCW-1Wind228 MWOperating — dated evidence

Sourced events

  1. 19 Oct 2018 · PNYCW-1

    Operating by the dated operator publication; this is an evidence boundary, not a commissioning timestamp or a live availability observation. Pen y Cymoedd wind generation only; the separately reported 22 MW battery is excluded. The Power Station Dictionary maps PNYCW-1 to this wind farm.

    Source date: 2018-10-19 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

PNYCW-1 · 228 MW · evidenced from 2018-10-19

Pen y Cymoedd wind generation only; the separately reported 22 MW battery is excluded. The Power Station Dictionary maps PNYCW-1 to this wind farm.

Source 2018-10-19 · reviewed 2026-09-13

Operator capacity source

Whole-site registered total: 228 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Pen y Cymoedd Wind Farm is a operating wind site in South Wales. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 228 MW on the displayed capacity basis.

Published site coordinate.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.