Harestanes Windfarm

South Scotland · Wind · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
136 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
HRSTW-1Wind142 MWOperating — dated evidence

Sourced events

  1. 1 Jul 2014 · HRSTW-1

    Dated evidence of the completed generating site; not a live availability observation. The operator confirms the completed Harestanes farm has 68 turbines and 136 MW. The dictionary maps the original farm to HRSTW-1; proposed extensions are excluded. The 142.3 MW registry figure remains separate.

    Source date: 2014-07-01 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

HRSTW-1 · 136 MW · evidenced from 2014-07-01

The operator confirms the completed Harestanes farm has 68 turbines and 136 MW. The dictionary maps the original farm to HRSTW-1; proposed extensions are excluded. The 142.3 MW registry figure remains separate.

Source 2014-07-01 · reviewed 2026-09-13

Operator capacity source

Whole-site registered total: 142.3 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Harestanes Windfarm is a operating wind site in South Scotland. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 136 MW on the displayed capacity basis.

Published site coordinate.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.