Freasdail Wind Farm
North Scotland · Wind · Operating
Output history
Reported availability
Unit lifecycle and sources
| BM unit | Technology | Registered capacity | Current lifecycle |
|---|---|---|---|
| FSDLW-1 | Wind | 22 MW | Operating — dated evidence |
Sourced events
- 18 Aug 2017 · FSDLW-1
TRIG interim report, signed 17 August 2017, page 4 confirms completed commissioning of eleven turbines in the first half of 2017, rounded to 22.6 MW. Contractor Ainscough records the installed 22.55 MW equipment on 20 January 2017; RES corroborates 22.55 MW and March commissioning. FSDLW-1 is the sole mapped generation unit. Evidence starts after the report, not at construction completion. Equipment source: https://www.ainscough.co.uk/news/freasdail-wind-farm/
Source date: 2017-08-17 · Reviewed: 2026-09-13
Primary source (opens in a new tab)
Physical capacity evidence
FSDLW-1 · 22.55 MW · evidenced from 2017-08-18
TRIG interim report, signed 17 August 2017, page 4 confirms completed commissioning of eleven turbines in the first half of 2017, rounded to 22.6 MW. Contractor Ainscough records the installed 22.55 MW equipment on 20 January 2017; RES corroborates 22.55 MW and March commissioning. FSDLW-1 is the sole mapped generation unit. Evidence starts after the report, not at construction completion. Equipment source: https://www.ainscough.co.uk/news/freasdail-wind-farm/
Source 2017-08-17 · reviewed 2026-09-13
Operator capacity sourceWhole-site registered total: 22.2 MW, including retired units.
Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.
About this asset
Freasdail Wind Farm is a operating wind site in North Scotland. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 23 MW on the displayed capacity basis.
Published site coordinate.
Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.