Dunmglass Wind Farm

North Scotland · Wind · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
94 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
DUNGW-1Wind100 MWOperating — dated evidence

Sourced events

  1. 8 Jun 2020 · DUNGW-1

    Operating by the dated operator publication; this is an evidence boundary, not a commissioning timestamp or a live availability observation. The operator reports 94 MW for Dunmaglass, named Dunmglass in the dictionary mapping for DUNGW-1. This is the whole farm, not the joint-venture share; the 100 MW registry reference remains separate.

    Source date: 2020-06-08 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

DUNGW-1 · 94 MW · evidenced from 2020-06-08

The operator reports 94 MW for Dunmaglass, named Dunmglass in the dictionary mapping for DUNGW-1. This is the whole farm, not the joint-venture share; the 100 MW registry reference remains separate.

Source 2020-06-08 · reviewed 2026-09-13

Operator capacity source

Whole-site registered total: 100 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Dunmglass Wind Farm is a operating wind site in North Scotland. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 94 MW on the displayed capacity basis.

Published site coordinate.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.