Dudgeon Offshore Wind Farm Generator
Off the coast of East England · Wind · Operating
Output history
Reported availability
Unit lifecycle and sources
| BM unit | Technology | Registered capacity | Current lifecycle |
|---|---|---|---|
| DDGNO-1 | Wind | 108 MW | Operating — dated evidence |
| DDGNO-2 | Wind | 90 MW | Operating — dated evidence |
| DDGNO-3 | Wind | 102 MW | Operating — dated evidence |
| DDGNO-4 | Wind | 102 MW | Operating — dated evidence |
Sourced events
- 1 Jun 2026 · DDGNO-1
DESNZ DUKES 5.11, '5.11 Full list', row 1041, lists Dudgeon BMU 1 as operational at end May 2026 with 108 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 108 MW registry reference remains separate.
Source date: 2026-07-30 · Reviewed: 2026-09-13
Primary source (opens in a new tab) - 1 Jun 2026 · DDGNO-2
DESNZ DUKES 5.11, '5.11 Full list', row 1043, lists Dudgeon BMU 2 as operational at end May 2026 with 90 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 90 MW registry reference remains separate.
Source date: 2026-07-30 · Reviewed: 2026-09-13
Primary source (opens in a new tab) - 1 Jun 2026 · DDGNO-3
DESNZ DUKES 5.11, '5.11 Full list', row 1044, lists Dudgeon BMU 3 as operational at end May 2026 with 102 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 102 MW registry reference remains separate.
Source date: 2026-07-30 · Reviewed: 2026-09-13
Primary source (opens in a new tab) - 1 Jun 2026 · DDGNO-4
DESNZ DUKES 5.11, '5.11 Full list', row 1045, lists Dudgeon BMU 4 as operational at end May 2026 with 102 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 102 MW registry reference remains separate.
Source date: 2026-07-30 · Reviewed: 2026-09-13
Primary source (opens in a new tab)
Physical capacity evidence
DDGNO-1 · 108 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 1041, lists Dudgeon BMU 1 as operational at end May 2026 with 108 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 108 MW registry reference remains separate.
Source 2026-07-30 · reviewed 2026-09-13
Operator capacity sourceDDGNO-2 · 90 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 1043, lists Dudgeon BMU 2 as operational at end May 2026 with 90 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 90 MW registry reference remains separate.
Source 2026-07-30 · reviewed 2026-09-13
Operator capacity sourceDDGNO-3 · 102 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 1044, lists Dudgeon BMU 3 as operational at end May 2026 with 102 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 102 MW registry reference remains separate.
Source 2026-07-30 · reviewed 2026-09-13
Operator capacity sourceDDGNO-4 · 102 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 1045, lists Dudgeon BMU 4 as operational at end May 2026 with 102 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 102 MW registry reference remains separate.
Source 2026-07-30 · reviewed 2026-09-13
Operator capacity sourceWhole-site registered total: 402 MW, including retired units.
Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.
About this asset
Dudgeon Offshore Wind Farm Generator is a operating wind site in East England. It has 4 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism units, with 402 MW on the displayed capacity basis.
Published site coordinate (offshore).
Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.