Dudgeon Offshore Wind Farm Generator

Off the coast of East England · Wind · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
402 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
DDGNO-1Wind108 MWOperating — dated evidence
DDGNO-2Wind90 MWOperating — dated evidence
DDGNO-3Wind102 MWOperating — dated evidence
DDGNO-4Wind102 MWOperating — dated evidence

Sourced events

  1. 1 Jun 2026 · DDGNO-1

    DESNZ DUKES 5.11, '5.11 Full list', row 1041, lists Dudgeon BMU 1 as operational at end May 2026 with 108 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 108 MW registry reference remains separate.

    Source date: 2026-07-30 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)
  2. 1 Jun 2026 · DDGNO-2

    DESNZ DUKES 5.11, '5.11 Full list', row 1043, lists Dudgeon BMU 2 as operational at end May 2026 with 90 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 90 MW registry reference remains separate.

    Source date: 2026-07-30 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)
  3. 1 Jun 2026 · DDGNO-3

    DESNZ DUKES 5.11, '5.11 Full list', row 1044, lists Dudgeon BMU 3 as operational at end May 2026 with 102 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 102 MW registry reference remains separate.

    Source date: 2026-07-30 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)
  4. 1 Jun 2026 · DDGNO-4

    DESNZ DUKES 5.11, '5.11 Full list', row 1045, lists Dudgeon BMU 4 as operational at end May 2026 with 102 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 102 MW registry reference remains separate.

    Source date: 2026-07-30 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

DDGNO-1 · 108 MW · evidenced from 2026-06-01

DESNZ DUKES 5.11, '5.11 Full list', row 1041, lists Dudgeon BMU 1 as operational at end May 2026 with 108 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 108 MW registry reference remains separate.

Source 2026-07-30 · reviewed 2026-09-13

Operator capacity source

DDGNO-2 · 90 MW · evidenced from 2026-06-01

DESNZ DUKES 5.11, '5.11 Full list', row 1043, lists Dudgeon BMU 2 as operational at end May 2026 with 90 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 90 MW registry reference remains separate.

Source 2026-07-30 · reviewed 2026-09-13

Operator capacity source

DDGNO-3 · 102 MW · evidenced from 2026-06-01

DESNZ DUKES 5.11, '5.11 Full list', row 1044, lists Dudgeon BMU 3 as operational at end May 2026 with 102 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 102 MW registry reference remains separate.

Source 2026-07-30 · reviewed 2026-09-13

Operator capacity source

DDGNO-4 · 102 MW · evidenced from 2026-06-01

DESNZ DUKES 5.11, '5.11 Full list', row 1045, lists Dudgeon BMU 4 as operational at end May 2026 with 102 MW installed. Explicit numbered BMU in inventory. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 102 MW registry reference remains separate.

Source 2026-07-30 · reviewed 2026-09-13

Operator capacity source

Whole-site registered total: 402 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Dudgeon Offshore Wind Farm Generator is a operating wind site in East England. It has 4 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism units, with 402 MW on the displayed capacity basis.

Published site coordinate (offshore).

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.