Skip to main content

Dersalloch Windfarm

South Scotland · Wind · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
69 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
DRSLW-1Wind71 MWOperating — dated evidence

Sourced events

  1. 4 Nov 2020 · DRSLW-1

    ScottishPower reports the operating Dersalloch wind farm at 69 MW. The dictionary maps its sole generation unit to DRSLW-1. Evidence begins the next complete UTC day after publication, not an inferred 2016 commissioning day. Future battery equipment is excluded; the 70.9 MW registry reference is preserved.

    Source date: 2020-11-03 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

DRSLW-1 · 69 MW · evidenced from 2020-11-04

ScottishPower reports the operating Dersalloch wind farm at 69 MW. The dictionary maps its sole generation unit to DRSLW-1. Evidence begins the next complete UTC day after publication, not an inferred 2016 commissioning day. Future battery equipment is excluded; the 70.9 MW registry reference is preserved.

Source 2020-11-03 · reviewed 2026-09-13

Operator capacity source

Whole-site registered total: 70.9 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Dersalloch Windfarm is a operating wind site in South Scotland. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 69 MW on the displayed capacity basis.

Published site coordinate.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.