Corriemoillie Wind Farm
North Scotland · Wind · Operating
Output history
Reported availability
Unit lifecycle and sources
| BM unit | Technology | Registered capacity | Current lifecycle |
|---|---|---|---|
| CRMLW-1 | Wind | 48 MW | Operating — dated evidence |
Sourced events
- 1 Jun 2026 · CRMLW-1
DESNZ DUKES 5.11, '5.11 Full list', row 227, lists Corriemoillie as operational at end May 2026 with 48.45 MW installed. EDF also describes 17 GE turbines operating at 2.85 MW, which reconciles to 48.45 MW. CRMLW-1 is the sole mapped generation BMU. EDF's current 47.5 MW site figure is retained as a different generating/export basis; its page's 3.2 MW turbine label does not reconcile with the fleet.
Source date: 2026-07-30 · Reviewed: 2026-09-19
Primary source (opens in a new tab)
Physical capacity evidence
CRMLW-1 · 48.45 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 227, lists Corriemoillie as operational at end May 2026 with 48.45 MW installed. EDF also describes 17 GE turbines operating at 2.85 MW, which reconciles to 48.45 MW. CRMLW-1 is the sole mapped generation BMU. EDF's current 47.5 MW site figure is retained as a different generating/export basis; its page's 3.2 MW turbine label does not reconcile with the fleet.
Source 2026-07-30 · reviewed 2026-09-19
Operator capacity sourceWhole-site registered total: 48 MW, including retired units.
Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.
About this asset
Corriemoillie Wind Farm is a operating wind site in North Scotland. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 48 MW on the displayed capacity basis.
Published site coordinate.
Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.