Corriegarth Wind Farm

North Scotland · Wind · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
70 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
CGTHW-1Wind69 MWOperating — dated evidence

Sourced events

  1. 23 Aug 2017 · CGTHW-1

    Developer Invenergy confirms the operating Corriegarth farm at 69.5 MW after April 2017 commissioning. CGTHW-1 is its sole mapped generation unit. Evidence starts after the dated sale announcement, not an inferred April day. The 69 MW registry reference remains separate; Corriegarth 2 is excluded.

    Source date: 2017-08-22 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

CGTHW-1 · 69.5 MW · evidenced from 2017-08-23

Developer Invenergy confirms the operating Corriegarth farm at 69.5 MW after April 2017 commissioning. CGTHW-1 is its sole mapped generation unit. Evidence starts after the dated sale announcement, not an inferred April day. The 69 MW registry reference remains separate; Corriegarth 2 is excluded.

Source 2017-08-22 · reviewed 2026-09-13

Operator capacity source

Whole-site registered total: 69 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Corriegarth Wind Farm is a operating wind site in North Scotland. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 70 MW on the displayed capacity basis.

Published site coordinate.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.