Clyde Central Windfarm, Clyde North Windfarm, Clyde South Windfarm

South Scotland · Wind · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
522 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
CLDCW-1Wind200 MWOperating — dated evidence
CLDNW-1Wind200 MWOperating — dated evidence
CLDSW-1Wind150 MWOperating — dated evidence

Sourced events

  1. 1 Jun 2026 · CLDCW-1

    DESNZ DUKES 5.11, '5.11 Full list', row 1207, lists Clyde Windfarm (Central) as operational at end May 2026 with 195.9 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDCW-1. Evidence starts on 1 June, not an inferred commissioning date; the 200 MW registry reference remains separate.

    Source date: 2026-07-30 · Reviewed: 2026-09-19

    Primary source (opens in a new tab)
  2. 1 Jun 2026 · CLDNW-1

    DESNZ DUKES 5.11, '5.11 Full list', row 1208, lists Clyde Windfarm (North) as operational at end May 2026 with 197.7 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDNW-1. Evidence starts on 1 June, not an inferred commissioning date; the 200 MW registry reference remains separate.

    Source date: 2026-07-30 · Reviewed: 2026-09-19

    Primary source (opens in a new tab)
  3. 1 Jun 2026 · CLDSW-1

    DESNZ DUKES 5.11, '5.11 Full list', row 1204, lists Clyde Windfarm (South) as operational at end May 2026 with 128.8 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDSW-1. Evidence starts on 1 June, not an inferred commissioning date; the 150 MW registry reference remains separate.

    Source date: 2026-07-30 · Reviewed: 2026-09-19

    Primary source (opens in a new tab)

Physical capacity evidence

CLDCW-1 · 195.9 MW · evidenced from 2026-06-01

DESNZ DUKES 5.11, '5.11 Full list', row 1207, lists Clyde Windfarm (Central) as operational at end May 2026 with 195.9 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDCW-1. Evidence starts on 1 June, not an inferred commissioning date; the 200 MW registry reference remains separate.

Source 2026-07-30 · reviewed 2026-09-19

Operator capacity source

CLDNW-1 · 197.7 MW · evidenced from 2026-06-01

DESNZ DUKES 5.11, '5.11 Full list', row 1208, lists Clyde Windfarm (North) as operational at end May 2026 with 197.7 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDNW-1. Evidence starts on 1 June, not an inferred commissioning date; the 200 MW registry reference remains separate.

Source 2026-07-30 · reviewed 2026-09-19

Operator capacity source

CLDSW-1 · 128.8 MW · evidenced from 2026-06-01

DESNZ DUKES 5.11, '5.11 Full list', row 1204, lists Clyde Windfarm (South) as operational at end May 2026 with 128.8 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDSW-1. Evidence starts on 1 June, not an inferred commissioning date; the 150 MW registry reference remains separate.

Source 2026-07-30 · reviewed 2026-09-19

Operator capacity source

Whole-site registered total: 550 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Clyde Central Windfarm, Clyde North Windfarm, Clyde South Windfarm is a operating wind site in South Scotland. It has 3 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism units, with 522 MW on the displayed capacity basis.

Published site coordinate.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.