Clyde Central Windfarm, Clyde North Windfarm, Clyde South Windfarm
South Scotland · Wind · Operating
Output history
Reported availability
Unit lifecycle and sources
| BM unit | Technology | Registered capacity | Current lifecycle |
|---|---|---|---|
| CLDCW-1 | Wind | 200 MW | Operating — dated evidence |
| CLDNW-1 | Wind | 200 MW | Operating — dated evidence |
| CLDSW-1 | Wind | 150 MW | Operating — dated evidence |
Sourced events
- 1 Jun 2026 · CLDCW-1
DESNZ DUKES 5.11, '5.11 Full list', row 1207, lists Clyde Windfarm (Central) as operational at end May 2026 with 195.9 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDCW-1. Evidence starts on 1 June, not an inferred commissioning date; the 200 MW registry reference remains separate.
Source date: 2026-07-30 · Reviewed: 2026-09-19
Primary source (opens in a new tab) - 1 Jun 2026 · CLDNW-1
DESNZ DUKES 5.11, '5.11 Full list', row 1208, lists Clyde Windfarm (North) as operational at end May 2026 with 197.7 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDNW-1. Evidence starts on 1 June, not an inferred commissioning date; the 200 MW registry reference remains separate.
Source date: 2026-07-30 · Reviewed: 2026-09-19
Primary source (opens in a new tab) - 1 Jun 2026 · CLDSW-1
DESNZ DUKES 5.11, '5.11 Full list', row 1204, lists Clyde Windfarm (South) as operational at end May 2026 with 128.8 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDSW-1. Evidence starts on 1 June, not an inferred commissioning date; the 150 MW registry reference remains separate.
Source date: 2026-07-30 · Reviewed: 2026-09-19
Primary source (opens in a new tab)
Physical capacity evidence
CLDCW-1 · 195.9 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 1207, lists Clyde Windfarm (Central) as operational at end May 2026 with 195.9 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDCW-1. Evidence starts on 1 June, not an inferred commissioning date; the 200 MW registry reference remains separate.
Source 2026-07-30 · reviewed 2026-09-19
Operator capacity sourceCLDNW-1 · 197.7 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 1208, lists Clyde Windfarm (North) as operational at end May 2026 with 197.7 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDNW-1. Evidence starts on 1 June, not an inferred commissioning date; the 200 MW registry reference remains separate.
Source 2026-07-30 · reviewed 2026-09-19
Operator capacity sourceCLDSW-1 · 128.8 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 1204, lists Clyde Windfarm (South) as operational at end May 2026 with 128.8 MW installed. The Power Station Dictionary maps the matching Central, North and South BMUs explicitly; this record applies only to CLDSW-1. Evidence starts on 1 June, not an inferred commissioning date; the 150 MW registry reference remains separate.
Source 2026-07-30 · reviewed 2026-09-19
Operator capacity sourceWhole-site registered total: 550 MW, including retired units.
Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.
About this asset
Clyde Central Windfarm, Clyde North Windfarm, Clyde South Windfarm is a operating wind site in South Scotland. It has 3 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism units, with 522 MW on the displayed capacity basis.
Published site coordinate.
Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.