Ffestiniog

North Wales & Merseyside · Pumped Storage · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
360 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
FFES-1Pumped Storage91 MWOperating — dated evidence
FFES-2Pumped Storage92 MWOperating — dated evidence
FFES-3Pumped Storage91 MWOperating — dated evidence
FFES-4Pumped Storage91 MWOperating — dated evidence

Sourced events

  1. 19 Sept 2026 · FFES-1

    The current operator page identifies four generator-motor units and rates each as a 90 MW generator. The Power Station Dictionary maps exactly FFES-1 through FFES-4, so this is per-machine evidence rather than a divided 360 MW site total. The 91 MW registry reference remains separate.

    Source date: 2026-09-19 · Reviewed: 2026-09-19

    Primary source (opens in a new tab)
  2. 19 Sept 2026 · FFES-2

    The current operator page identifies four generator-motor units and rates each as a 90 MW generator. The Power Station Dictionary maps exactly FFES-1 through FFES-4, so this is per-machine evidence rather than a divided 360 MW site total. The 91.9 MW registry reference remains separate.

    Source date: 2026-09-19 · Reviewed: 2026-09-19

    Primary source (opens in a new tab)
  3. 19 Sept 2026 · FFES-3, FFES-4

    The current operator page identifies four generator-motor units and rates each as a 90 MW generator. The Power Station Dictionary maps exactly FFES-1 through FFES-4, so this is per-machine evidence rather than a divided 360 MW site total. The 90.9 MW registry reference remains separate.

    Source date: 2026-09-19 · Reviewed: 2026-09-19

    Primary source (opens in a new tab)

Physical capacity evidence

FFES-1 · 90 MW · evidenced from 2026-09-19

The current operator page identifies four generator-motor units and rates each as a 90 MW generator. The Power Station Dictionary maps exactly FFES-1 through FFES-4, so this is per-machine evidence rather than a divided 360 MW site total. The 91 MW registry reference remains separate.

Source 2026-09-19 · reviewed 2026-09-19

Operator capacity source

FFES-2 · 90 MW · evidenced from 2026-09-19

The current operator page identifies four generator-motor units and rates each as a 90 MW generator. The Power Station Dictionary maps exactly FFES-1 through FFES-4, so this is per-machine evidence rather than a divided 360 MW site total. The 91.9 MW registry reference remains separate.

Source 2026-09-19 · reviewed 2026-09-19

Operator capacity source

FFES-3 · 90 MW · evidenced from 2026-09-19

The current operator page identifies four generator-motor units and rates each as a 90 MW generator. The Power Station Dictionary maps exactly FFES-1 through FFES-4, so this is per-machine evidence rather than a divided 360 MW site total. The 90.9 MW registry reference remains separate.

Source 2026-09-19 · reviewed 2026-09-19

Operator capacity source

FFES-4 · 90 MW · evidenced from 2026-09-19

The current operator page identifies four generator-motor units and rates each as a 90 MW generator. The Power Station Dictionary maps exactly FFES-1 through FFES-4, so this is per-machine evidence rather than a divided 360 MW site total. The 90.9 MW registry reference remains separate.

Source 2026-09-19 · reviewed 2026-09-19

Operator capacity source

Whole-site registered total: 364.7 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Ffestiniog is a operating pumped storage site in North Wales & Merseyside. It has 4 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism units, with 360 MW on the displayed capacity basis.

Published site coordinate.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.