| BM unit | Technology | Registered capacity | Current lifecycle |
|---|---|---|---|
| GLNDO-1 | Hydro | 100 MW | Operating — dated evidence |
Sourced events
- 15 Jul 2014 · GLNDO-1
SSE describes its operating 100 MW Glendoe hydro scheme on 14 July 2014. The dictionary maps GLNDO-1 to Glendoe. Evidence begins the next complete UTC day; the earlier 2009 tunnel failure and 2012 restart are not an uninterrupted operating or capacity history. Other small schemes listed on the modern Glendoe page are excluded.
Source date: 2014-07-14 · Reviewed: 2026-09-13
Primary source (opens in a new tab)
Physical capacity evidence
GLNDO-1 · 100 MW · evidenced from 2014-07-15
SSE describes its operating 100 MW Glendoe hydro scheme on 14 July 2014. The dictionary maps GLNDO-1 to Glendoe. Evidence begins the next complete UTC day; the earlier 2009 tunnel failure and 2012 restart are not an uninterrupted operating or capacity history. Other small schemes listed on the modern Glendoe page are excluded.
Source 2014-07-14 · reviewed 2026-09-13
Operator capacity sourceWhole-site registered total: 100 MW, including retired units.
Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.
About this asset
Glendoe is a operating hydro site in North Scotland. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 100 MW on the displayed capacity basis.
Published site coordinate.