Sutton Bridge
East England · Gas · Operating
Output history
Reported availability
Unit lifecycle and sources
| BM unit | Technology | Registered capacity | Current lifecycle |
|---|---|---|---|
| SUTB-1 | Gas | 850 MW | Operating — dated evidence |
Sourced events
- 1 Jun 2026 · SUTB-1
DESNZ DUKES 5.11, '5.11 Full list', row 103, lists SUTTON BRIDGE POWER GENERATION as operational at end May 2026 with 819 MW installed. Named generating plant; sole mapped generation BMU. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 850 MW registry reference remains separate. The similarly named solar installation is excluded.
Source date: 2026-07-30 · Reviewed: 2026-09-13
Primary source (opens in a new tab)
Physical capacity evidence
SUTB-1 · 819 MW · evidenced from 2026-06-01
DESNZ DUKES 5.11, '5.11 Full list', row 103, lists SUTTON BRIDGE POWER GENERATION as operational at end May 2026 with 819 MW installed. Named generating plant; sole mapped generation BMU. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 850 MW registry reference remains separate. The similarly named solar installation is excluded.
Source 2026-07-30 · reviewed 2026-09-13
Operator capacity sourceWhole-site registered total: 850 MW, including retired units.
Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.
About this asset
Sutton Bridge is a operating gas site in East England. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 819 MW on the displayed capacity basis.
Published site coordinate.
Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.