Langage

South West England · Gas · Operating

Lifecycle
Operating
Declared output
—
Sourced installed capacity
905 MW
Declared utilisation
—

Output history

Unavailable because this deployment has no stored history for that range.

Reported availability

REMIT unavailability affecting this station over the last 12 months.

Unit lifecycle and sources

Effective-dated status is applied before station capacity and technology are calculated.
BM unitTechnologyRegistered capacityCurrent lifecycle
LAGA-1Gas905 MWOperating — dated evidence

Sourced events

  1. 1 Jun 2026 · LAGA-1

    DESNZ DUKES 5.11, '5.11 Full list', row 261, lists EP Langage Ltd as operational at end May 2026 with 905 MW installed. Named generating plant; sole mapped generation BMU. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 905 MW registry reference remains separate.

    Source date: 2026-07-30 · Reviewed: 2026-09-13

    Primary source (opens in a new tab)

Physical capacity evidence

LAGA-1 · 905 MW · evidenced from 2026-06-01

DESNZ DUKES 5.11, '5.11 Full list', row 261, lists EP Langage Ltd as operational at end May 2026 with 905 MW installed. Named generating plant; sole mapped generation BMU. Evidence starts on the next complete UTC day after the inventory snapshot; this is not a commissioning date. Government-reported precision is retained; the 905 MW registry reference remains separate.

Source 2026-07-30 · reviewed 2026-09-13

Operator capacity source

Whole-site registered total: 905 MW, including retired units.

Registered capacity is the value retained in the committed BM-unit source snapshot. “Not retained” means the registry no longer supplied a positive figure; it does not mean the unit historically had no capacity. If a unit with a retirement event publishes a non-zero live declaration, the live declaration keeps it in the operating fleet pending review.

About this asset

Langage is a operating gas site in South West England. It has 1 non-retired (0 unverified) and 0 retired mapped Balancing Mechanism unit, with 905 MW on the displayed capacity basis.

Published site coordinate.

Current output is the operator’s declared Physical Notification. Metered output is published later and is shown as the solid portion of the history chart; outage shading comes from REMIT notices.